plans: RIP is the roadmap's one absent protocol, and 69 specs say they run it #2173

Merged
jaylouisw merged 1 commit from plan/1119-1537 into main 2026-11-19 15:48:12 +00:00
Owner

A forward plan, no code. RIP is the only Absent row in the engine table (docs/ROADMAP.md:30) while 69 device specs describe hardware that runs RIP and 19 promise RIP v2 by name; grep -rniE '\brip\b' engine/ finds three Cisco doc URLs in comments and nothing else.

The plan covers: config (router rip, network, version, auto-summary, passive-interface, serialize whitelist), a pure distance-vector engine/rip.js (hop count, split horizon, ceiling 16), installation into Device.routeTo() at AD 120 with an R code and show ip route / show ip rip database, timers in convergence.js (30/180/240), and the doc + roadmap flip. Six steps, each one PR; steps 3-4 must land in order by one worker. New protocol surface, labelled needs Jay's approval.

Closes no open issue (#130 is a device request).

A forward plan, no code. RIP is the only `Absent` row in the engine table (docs/ROADMAP.md:30) while 69 device specs describe hardware that runs RIP and 19 promise RIP v2 by name; `grep -rniE '\brip\b' engine/` finds three Cisco doc URLs in comments and nothing else. The plan covers: config (`router rip`, `network`, `version`, auto-summary, passive-interface, serialize whitelist), a pure distance-vector `engine/rip.js` (hop count, split horizon, ceiling 16), installation into `Device.routeTo()` at AD 120 with an `R` code and `show ip route` / `show ip rip database`, timers in `convergence.js` (30/180/240), and the doc + roadmap flip. Six steps, each one PR; steps 3-4 must land in order by one worker. New protocol surface, labelled needs Jay's approval. Closes no open issue (#130 is a device request).
plans: RIP is the roadmap's one absent protocol, and 69 specs say they run it
All checks were successful
CI / Classify the change (pull_request) Successful in 15s
PR rebase / Rebase onto main and arm auto-merge (pull_request) Successful in 8s
CI / Test (Node 18) (pull_request) Successful in 1m2s
CI / Test (Node 20) (pull_request) Successful in 46s
CI / Test (Node 22) (pull_request) Successful in 44s
CI / Server smoke test (pull_request) Successful in 7s
CI / Docker build (pull_request) Successful in 47s
CI / Arm auto-merge (pull_request) Successful in 5s
a8dd6a7ebd
forgejo-actions scheduled this pull request to auto merge when all checks succeed 2026-11-19 15:46:34 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
jaylouisw/packetforge!2173
No description provided.