cisco: the Catalyst 9200L fixed-uplink family, 14 members from the data sheet #1707

Merged
jaylouisw merged 2 commits from catalogue/1116-1825 into main 2026-11-16 18:36:03 +00:00
Owner

Adds every fixed-uplink Catalyst 9200L the Cisco data sheet names, and repairs the one C9200L record already in the catalogue.

Members (14 specs, 13 new). C9200L-24T-4G, -24P-4G, -48T-4G, -48P-4G, -48PL-4G, -24T-4X, -24P-4X, -48T-4X, -48P-4X, -48PL-4X, -24PXG-4X, -24PXG-2Y, -48PXG-4X, -48PXG-2Y.

Correction to the record that was already there. devices/cisco/c9200l-24p-4g.json declared only l2-forward + cli, no PoE, 4x SFP uplinks and nothing else - on a switch whose data sheet calls it "24 ports full PoE+". It now declares the PoE+ ports (30 W a port, poeOutClass: "PoE+"), the 370 W / 740 W budgets from Table 4, layer 3 (the data sheet lists OSPF, EIGRP, ISIS, RIP, routed access), 802.1Q/LACP/STP, the web UI, the 56 Gbps fabric and the RJ-45 + USB mini-B console. Nothing it declared was dropped.

Evidence, per field.

Every spec carries sourceUrl = the data sheet, poe.sourceUrl on the PoE models, and both URLs in notes.

Discrepancies stated, not smoothed over.

  1. The data sheet says the fixed uplinks on the -4X models are "4x 1/10G", the installation guide says "4x10G SFP+". The cages are declared as accepting 1G and 10G, following the data sheet; the disagreement is recorded in notes.
  2. Same for -2Y: "2x 1/10/25G" (data sheet) vs "2x25G SFP28" (installation guide); declared 1G/10G/25G.
  3. mGig downlinks: the data sheet states the mGig ports run "up to 10G" and lists IEEE 802.3bz and 10GBASE-T for mGig SKUs. The specs declare 1G/2.5G/5G/10G on those cages at speed: "10G"; the switching-capacity totals only reconcile with the mGig ports counted at 10G (48PXG-4X: 12x10G + 36x1G + 4x10G = 392 Gbps). Sub-1G rates are not itemised in either source, so 100M is not declared on an mGig port.
  4. -48PL- models: all 48 ports source PoE+ but the default 600 W supply gives 370 W, so the record says partial budget rather than pretending 48 x 30 W fits.

Gates. node scripts/syntax-check.js 356 files OK; node scripts/audit-port-types.js exit 0 ("No port contradicts its declared type"); check-control-bytes.js clean; regen-registry-doc.js rewritten (2,298 models / 27,253 sockets / 925 shapes) with doc-catalog-counts 43/43, spec-vs-description 3/3, hardware-invariants 26/26, catalogue-hygiene 25/25, faceplate-catalogue 14/14, device-aliases 13/13, importer-roundtrip 26/26, import-devices-capabilities 34/34.

Adds every fixed-uplink Catalyst 9200L the Cisco data sheet names, and repairs the one C9200L record already in the catalogue. **Members (14 specs, 13 new).** C9200L-24T-4G, -24P-4G, -48T-4G, -48P-4G, -48PL-4G, -24T-4X, -24P-4X, -48T-4X, -48P-4X, -48PL-4X, -24PXG-4X, -24PXG-2Y, -48PXG-4X, -48PXG-2Y. **Correction to the record that was already there.** `devices/cisco/c9200l-24p-4g.json` declared only `l2-forward` + `cli`, no PoE, 4x SFP uplinks and nothing else - on a switch whose data sheet calls it "24 ports full PoE+". It now declares the PoE+ ports (30 W a port, `poeOutClass: "PoE+"`), the 370 W / 740 W budgets from Table 4, layer 3 (the data sheet lists OSPF, EIGRP, ISIS, RIP, routed access), 802.1Q/LACP/STP, the web UI, the 56 Gbps fabric and the RJ-45 + USB mini-B console. Nothing it declared was dropped. **Evidence, per field.** - Port census, PoE budgets, stacking, capacity, IOS XE floor: Cisco Catalyst 9200 Series Switches Data Sheet - https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-9200-series-switches/nb-06-cat9200-ser-data-sheet-cte-en.html (Table 1 models, Table 4 PoE with primary/secondary PSU, Table 5 StackWise-80, Table 9 switching capacity and forwarding rate, "run on Cisco IOS XE Release 16.9.2 or later"). - Per-model port layout and StackWise-80: Catalyst 9200 Hardware Installation Guide, product overview - https://www.cisco.com/c/en/us/td/docs/switches/lan/catalyst9200/hardware/install/b-c9200-hig/product_overview.html (Table 1, "Management Ports"). Every spec carries `sourceUrl` = the data sheet, `poe.sourceUrl` on the PoE models, and both URLs in `notes`. **Discrepancies stated, not smoothed over.** 1. The data sheet says the fixed uplinks on the `-4X` models are "4x 1/10G", the installation guide says "4x10G SFP+". The cages are declared as accepting 1G and 10G, following the data sheet; the disagreement is recorded in `notes`. 2. Same for `-2Y`: "2x 1/10/25G" (data sheet) vs "2x25G SFP28" (installation guide); declared 1G/10G/25G. 3. mGig downlinks: the data sheet states the mGig ports run "up to 10G" and lists IEEE 802.3bz and 10GBASE-T for mGig SKUs. The specs declare 1G/2.5G/5G/10G on those cages at `speed: "10G"`; the switching-capacity totals only reconcile with the mGig ports counted at 10G (48PXG-4X: 12x10G + 36x1G + 4x10G = 392 Gbps). Sub-1G rates are not itemised in either source, so 100M is **not** declared on an mGig port. 4. `-48PL-` models: all 48 ports source PoE+ but the default 600 W supply gives 370 W, so the record says partial budget rather than pretending 48 x 30 W fits. **Gates.** `node scripts/syntax-check.js` 356 files OK; `node scripts/audit-port-types.js` exit 0 ("No port contradicts its declared type"); `check-control-bytes.js` clean; `regen-registry-doc.js` rewritten (2,298 models / 27,253 sockets / 925 shapes) with `doc-catalog-counts` 43/43, `spec-vs-description` 3/3, `hardware-invariants` 26/26, `catalogue-hygiene` 25/25, `faceplate-catalogue` 14/14, `device-aliases` 13/13, `importer-roundtrip` 26/26, `import-devices-capabilities` 34/34.
cisco: the Catalyst 9200L fixed-uplink family, 14 members from the data sheet
All checks were successful
CI / Classify the change (pull_request) Successful in 12s
PR rebase / Rebase onto main and arm auto-merge (pull_request) Successful in 19s
CI / Server smoke test (pull_request) Successful in 15s
CI / Docker build (pull_request) Successful in 27s
CI / Test (Node 20) (pull_request) Successful in 59s
CI / Test (Node 18) (pull_request) Successful in 1m6s
CI / Test (Node 22) (pull_request) Successful in 1m5s
29d5aa6ffc
Every fixed-uplink C9200L the data sheet Table 1 names, plus a correction to the
one record that was already here:

  - 24/48 x 1G RJ-45 (data or full PoE+, plus the two partial-PoE 48PL models)
  - 4x 1G SFP, 4x 1/10G SFP+ or 2x 1/10/25G SFP28 fixed uplinks
  - mGig models: 8 or 12 mGig downlinks to 10G alongside 16/36/40 1G ports
  - PoE budget per data sheet Table 4 (370/740/1440 W by PSU pair)
  - switching capacity and forwarding rate per data sheet Table 9
  - StackWise-80, 80 Gbps, 8 members; IOS XE 16.9.2 or later
  - RJ-45 + USB mini-B console, 10/100/1000 RJ-45 management port

Sources: Cisco Catalyst 9200 Series data sheet (Table 1, 4, 5, 9) and the
Catalyst 9200 hardware installation guide, product overview (Table 1).
jaylouisw force-pushed catalogue/1116-1825 from 29d5aa6ffc
All checks were successful
CI / Classify the change (pull_request) Successful in 12s
PR rebase / Rebase onto main and arm auto-merge (pull_request) Successful in 19s
CI / Server smoke test (pull_request) Successful in 15s
CI / Docker build (pull_request) Successful in 27s
CI / Test (Node 20) (pull_request) Successful in 59s
CI / Test (Node 18) (pull_request) Successful in 1m6s
CI / Test (Node 22) (pull_request) Successful in 1m5s
to 0d42fb6854
All checks were successful
CI / Classify the change (pull_request) Successful in 15s
PR rebase / Rebase onto main and arm auto-merge (pull_request) Successful in 21s
CI / Server smoke test (pull_request) Successful in 18s
CI / Test (Node 20) (pull_request) Successful in 47s
CI / Test (Node 18) (pull_request) Successful in 53s
CI / Docker build (pull_request) Successful in 26s
CI / Test (Node 22) (pull_request) Successful in 51s
2026-11-16 18:33:36 +00:00
Compare
jaylouisw scheduled this pull request to auto merge when all checks succeed 2026-11-16 18:35:28 +00:00
jaylouisw scheduled this pull request to auto merge when all checks succeed 2026-11-16 18:35:56 +00:00
jaylouisw force-pushed catalogue/1116-1825 from 0d42fb6854
All checks were successful
CI / Classify the change (pull_request) Successful in 15s
PR rebase / Rebase onto main and arm auto-merge (pull_request) Successful in 21s
CI / Server smoke test (pull_request) Successful in 18s
CI / Test (Node 20) (pull_request) Successful in 47s
CI / Test (Node 18) (pull_request) Successful in 53s
CI / Docker build (pull_request) Successful in 26s
CI / Test (Node 22) (pull_request) Successful in 51s
to ed6dd33052
All checks were successful
CI / Classify the change (pull_request) Successful in 16s
PR rebase / Rebase onto main and arm auto-merge (pull_request) Successful in 17s
CI / Test (Node 18) (pull_request) Has been skipped
CI / Test (Node 20) (pull_request) Has been skipped
CI / Test (Node 22) (pull_request) Has been skipped
CI / Server smoke test (pull_request) Has been skipped
CI / Docker build (pull_request) Has been skipped
2026-11-16 18:36:00 +00:00
Compare
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
jaylouisw/packetforge!1707
No description provided.